BA II Plus Bond Worksheet: Price, YTM, Accrued Interest

Open it with [2ND] [BOND], clear it with [2ND] [CLR WORK], key SDT, CPN, RDT, RV, day count and frequency, then enter YLD or PRI and press CPT on the other. PRI is the clean price; add AI for the dirty price. On a coupon date, plain TVM keys are faster.

  • Fixed Income
  • 11 min read
  • Updated

Bond worksheet simulator

This guide's bond: coupons every 15 June and 15 December. Move the settlement day and watch AI, PRI and the dirty price change.

Day count
PRI, the clean price
97.97
AI, accrued interest
1.51

Dirty price, PRI + AI99.48

N
10
I/Y
3.25
PMT
3.00
FV
100.00

CPT PV, on the coupon date−97.89

92 of 183 days have accrued: the buyer pays 1.51 of the seller's coupon on top of the 97.97 quote.

On 360 the worksheet counts 30-day months, so 15 September is day 90 of 180, not 92 of 183.

The BA II Plus bond worksheet ([2ND] [BOND], above the number 9 key) does one thing plain TVM keys cannot: it prices a bond on any settlement date, coupon date or not, and splits the answer into clean price, accrued interest, and dirty price without a single hand calculation. Most candidates go their whole prep without opening it (they run fixed income through N, I/Y, PV, PMT, FV instead), and for the bulk of exam questions that instinct is correct.

The worksheet is a calendar bolted onto a bond. That is its whole advantage, and its whole cost. It earns its keep on a narrow band of problems (pricing between coupon dates, computing accrued interest, backing yield out of a quoted price on an odd settlement date) and slows you down everywhere else. This guide walks every field, gives full keystroke sequences, and marks the exact line where you should close it and reach for TVM keys instead.

Set P/Y correctly first ([2ND] [P/Y]): the worksheet's own frequency field is separate from the global P/Y setting, and mixing them up is the most common source of wrong answers here.

Bond worksheet fields: SDT, CPN, RDT, RV, day-count and frequency

The worksheet has six inputs and two outputs, cycled through with the down arrow. Each field has a short label, and you enter a value then press ENTER before moving on, unlike TVM keys, where you type a number and press the variable key directly.

The six inputs: SDT (settlement date), CPN (annual coupon rate), RDT (redemption/maturity date), RV (redemption value, almost always 100), day-count (ACT or 360), and frequency (2/Y or 1/Y). The two outputs are PRI (price) and YLD (yield): solve for whichever you don't already know, and AI (accrued interest) populates once either is computed.

Move through SDT → CPN → RDT → RV → day-count → frequency → PRI/YLD without hesitating, the same way you'd move through N → I/Y → PV → PMT → FV on TVM keys.

Opening the BOND worksheet and clearing it

Press [2ND] [BOND] to open the worksheet, then [2ND] [CLR WORK] to clear values left over from a previous problem. Skipping this is the top source of wrong answers: a stale RV of 1000 will corrupt a problem that assumes RV = 100, with no warning.

The worksheet always opens on SDT; the arrows cycle through all nine fields, and pressing [2ND] [BOND] again returns you to SDT without clearing entries.

Confirm you're in the bond worksheet, not a neighboring 2ND function, by checking the display reads "SDT" on open (easy to miss on the cramped keypad).

Entering settlement, coupon, and redemption dates

Dates go in as MM.DDYY, using the decimal point as separator: March 15, 2026 is 3.1526 ENTER, not 03/15/2026. The worksheet doesn't accept slashes, so check the display echoes the date back correctly.

CPN is the annual coupon rate entered as a percentage, the way I/Y works on TVM keys: a 5% coupon is entered as 5, not 0.05. RDT is the final maturity date, same format as SDT.

Dates and percentages both use a decimal point, so it's easy to enter a coupon rate into a date field if you lose track of which field you're on. Arrow back to SDT after entering RDT as a quick check.

RV defaults to 100 and should stay there for nearly every CFA problem. The day-count and frequency toggles both flip with [2ND] [SET] while sitting on that field (ACT or 360 for day-count, 2/Y or 1/Y for frequency), and the frequency toggle here is local to the bond worksheet only; it doesn't read from or write to the global setting covered in P/Y and C/Y on the BA II Plus.

FieldHoldsFormatTypical CFA default
SDTSettlement dateMM.DDYYgiven in problem
CPNAnnual coupon ratepercentagegiven in problem
RDTRedemption dateMM.DDYYgiven in problem
RVRedemption valueper 100 face100
Day-countACT or 360toggleACT
Frequency2/Y or 1/Ytoggle2/Y
PRIClean priceper 100 facesolve for this
YLDYield to maturitypercentagesolve for this

Pricing a bond between coupon dates

The worksheet answers "what's the clean price today" by combining the coupon rate, required yield, and the exact number of days left until maturity from whatever settlement date you enter, coupon date or not. That's the one thing plain TVM keys can't do, since TVM assumes you're standing exactly on a payment date.

Here's a full sequence for a 6% semiannual-coupon bond, coupons paid every June 15 and December 15, maturing June 15, 2031, settling September 15, 2026 (three months after the June coupon), priced to yield 6.5%.

  1. [2ND] [BOND], then [2ND] [CLR WORK]
  2. 9.1526 ENTER (SDT)
  3. ↓ 6 ENTER (CPN)
  4. ↓ 6.1531 ENTER (RDT)
  5. ↓ 100 ENTER (RV)
  6. ↓ confirm day-count reads ACT (2ND SET to toggle)
  7. ↓ confirm frequency reads 2/Y (2ND SET to toggle)
  8. ↓ 6.5 ENTER (YLD)
  9. ↓ CPT (solves PRI, the clean price)
  10. ↓ (reads AI, accrued interest since the last coupon)

The calculator returns clean price on the PRI line and accrued interest on the AI line without extra steps: you only need to compute accrued interest by hand if you want to sanity-check the machine's answer, which the accrued interest section below shows.

Reading PRI, AI, and the dirty price off the display

PRI is always the clean (flat) price: the price quoted in the market, stripped of accrued interest. AI is the interest owed to the seller for the coupon period already partly elapsed as of your settlement date.

The dirty price (also called the full price) is simply PRI + AI. The BA II Plus doesn't sum these for you, so add them by hand after reading both off the display. Put plainly: the clean price is the quote, the dirty price is the check.

dirty price=PRI+AI\text{dirty price} = \text{PRI} + \text{AI}
This guide's bond at 6.5%: 97.97 + 1.51 = 99.48 per 100 face.

Missing that distinction is a common way to get a mechanically correct calculator answer marked wrong: a question asking what a bond "would quote at" wants PRI; one asking how much you'd pay wants PRI + AI. Markets quote clean prices precisely so price moves only with changes in yield, not with the mechanical daily accrual of interest, so before opening the worksheet, note whether the question gives or wants a clean price, a dirty price, or accrued interest specifically.

Solving for yield from a quoted price

To solve for yield instead of price, enter every field as before but leave YLD blank and enter PRI instead, then press CPT on the YLD line. The worksheet works symmetrically: give it price, get yield; give it yield, get price.

Using the same bond as above, if the market quotes a clean price of 95.50, the sequence is:

  1. [2ND] [BOND], [2ND] [CLR WORK]
  2. Enter SDT, CPN, RDT, RV, day-count, and frequency as before
  3. ↓ past YLD (leave blank) to PRI
  4. 95.50 ENTER (PRI)
  5. ↑ CPT (solves YLD)

AI populates automatically once YLD is computed. A quick sanity check: run the worksheet on a settlement date that falls exactly on a coupon date and compare it against plain TVM keys: 2ND CLR TVM; 10 N; 3.25 I/Y; 3 PMT; 100 FV; CPT PV returns roughly -97.89 for the same 6%-coupon, 6.5%-yield bond at 5 years to maturity (negative since PV is a cash outflow: see the sign note below). The bond worksheet should return the same 97.89 on PRI with AI at zero, since there's no partial period to accrue on a coupon date.

If the two disagree by more than a rounding cent, check the frequency (2/Y vs 1/Y) and day-count toggle first: those settings silently change the answer with no error message. A full walkthrough lives in how to calculate YTM on the BA II Plus.

Yield from a 95.50 clean price

This guide's 6% bond, settling 15 September 2026 and maturing 15 June 2031, quoted at 95.50.

BA II Plus

SDT = 12-31-1990

[2ND][BOND][2ND][CLR WORK]

Open and clear: every field back to its default.

1 / 12Next

SDT = 9-15-2026

9.1526ENTER

Settlement date, as MM.DDYY.

2 / 12Next

CPN = 6.00

↓6ENTER

The full annual coupon: the worksheet halves it.

3 / 12Next

RDT = 6-15-2031

↓6.1531ENTER

Redemption date.

4 / 12Next

RV = 100.00

↓100ENTER

Per 100 of face value.

5 / 12Next

ACT

↓

Day count. 2ND SET toggles it to 360.

6 / 12Next

2/Y

↓

Semiannual. 2ND SET toggles it to 1/Y.

7 / 12Next

PRI = 0.00

↓↓

Past YLD, left blank: it is the unknown.

8 / 12Next

PRI = 95.50

95.50ENTER

The quoted clean price.

9 / 12Next

YLD = 0.00

↑

YLD sits just above PRI: CPT works on the field on screen.

10 / 12Next

YLD = 7.13

CPT

About 7.13%, above the 6.5% that gives a clean price of 97.97.

11 / 12Next

AI = 1.51

↓↓

Accrued interest for 92 of 183 days, the same at any yield.

12 / 12

Accrued interest and dirty vs clean price

Accrued interest is the portion of the next coupon the seller has already earned by holding the bond since the last coupon date, and it's what the buyer owes on top of the clean price at settlement: the seller's back pay for days already worked, settled up at the door. It's worth computing by hand once so the AI figure on screen isn't a black box.

The formula: accrued interest = (days since last coupon ÷ days in the coupon period) × coupon payment per period. Using actual/actual and the September 15, 2026 settlement above (92 days elapsed since the June 15 coupon, out of a 183-day period), accrued interest works out to (92 ÷ 183) × 3.00 ≈ 1.51 per 100 face, where 3.00 is half the 6% annual coupon.

AI=tT×PMTt=days since last couponT=days in the coupon periodPMT=coupon per period\begin{aligned} \text{AI} &= \frac{t}{T} \times \text{PMT} \\ t &= \text{days since last coupon} \\ T &= \text{days in the coupon period} \\ \text{PMT} &= \text{coupon per period} \end{aligned}
This guide's bond: (92 ÷ 183) × 3.00 ≈ 1.51 per 100 face.

Add that 1.51 to whatever PRI the worksheet shows and you get the dirty price. This hand check also catches data-entry mistakes fast: if your by-hand AI and the calculator's AI disagree by more than rounding, one of your dates is wrong. And it's the same fraction Level I sometimes tests as a standalone conceptual question, without a calculator.

ACT/ACT vs 30/360 day-count differences

ACT/ACT uses the real number of calendar days elapsed and in the coupon period: it's the default, and the convention most Treasury and government bonds use. 30/360 assumes every month has 30 days and every year has 360, a simplification common in some corporate and municipal markets that doesn't match the calendar.

The two conventions can produce noticeably different accrued interest and price for the same bond and dates, especially near February or 31-day months, so a question that specifies a convention is testing the toggle, not just the keystrokes.

If a question doesn't specify a convention, leave ACT/ACT selected: it's both the factory default and the more common convention for the government and quasi-government bonds most featured under the 2027 curriculum.

When to use TVM keys instead of the BOND worksheet

Use plain TVM keys whenever the bond is priced exactly on a coupon date (including "time zero" problems where settlement equals issuance), since that covers most CFA fixed income problems and gets you there faster with less room for date-format error. The worksheet's real advantage (handling fractional periods) isn't needed on a coupon date.

Sign convention matters on both: a bond purchase is a cash outflow, so PV comes back negative on TVM keys when N, I/Y, PMT, and FV are entered as positive, since the calculator assumes cash flows alternate direction. On the bond worksheet, PRI displays as a positive price with no sign flip.

The trade-off runs the other way for accrued interest, mid-period pricing, or any non-coupon settlement date: exactly what the worksheet was built for. Forcing those through TVM keys means manually computing a fractional-period exponent, slower and more error-prone than the worksheet.

Move the settlement day in the simulator at the top and watch AI and the dirty price change

TVM keys or the BOND worksheet?

Two or three questions about the problem in front of you, and the keys to reach for.

What kind of instrument is it?

Where does settlement fall?

What does the question want?

TVM keys: five inputs, no dates

Halve the coupon and the yield, double the years. For this guide's bond on a coupon date: 2ND CLR TVM; 10 N; 3.25 I/Y; 3 PMT; 100 FV; CPT PV gives -97.89, negative because a purchase is a cash outflow.

Start again

Not the bond worksheet

The bond worksheet is a bullet-bond tool only. For amortizing loans or bonds with a shrinking principal balance, use the BA II Plus amortization worksheet.

Start again

BOND worksheet: compute PRI

Key SDT, CPN, RDT, RV, day count, frequency and YLD, then CPT on PRI. PRI is the clean price the market quotes: 97.97 for this guide's bond at 6.5%, settling 15 September 2026.

Start again

BOND worksheet: add PRI and AI yourself

The calculator doesn't sum them. Compute PRI, move down to AI, and add: 97.97 + 1.51 = 99.48 per 100 for this guide's bond. A question asking what you'd pay wants this dirty price, not PRI.

Start again

BOND worksheet: key PRI, compute YLD

Key every field, leave YLD blank, enter the quoted price on PRI, then move back up to YLD and press CPT. A clean price of 95.50 on this guide's bond gives a yield of about 7.13%.

Start again

Coupon-date pricing: TVM keys are faster

A "price this bond given yield" problem at a coupon date needs five TVM inputs against the bond worksheet's six-plus fields: fewer fields, fewer chances to mis-enter a date under time pressure. This matches how most Level I and Level II problems are set up: valuation questions almost always price "as of" a clean time point rather than a specific calendar settlement date.

Remember that most bonds pay semiannually but quote yield annualized, so TVM halves both the coupon rate and yield and doubles the periods before entering anything: a 6% coupon paid semiannually becomes PMT at 3% per period, and a quoted 6.5% yield becomes 3.25% I/Y. Forgetting to halve the yield is the most common TVM bond-pricing mistake, and it looks plausible enough not to raise suspicion.

A broader refresher on how N, I/Y, PV, PMT, and FV interact makes both the TVM shortcut and the bond worksheet click faster: the worksheet is really just TVM math with a calendar layered on top.

Questions people ask

Nearly every question here is really the same question wearing a different costume: the worksheet handed back a number that doesn't match what the candidate expected. These are the mismatches that send people searching. Each answer leads with the direct fix, then explains why the calculator did what it did.

Most issues trace back to one of three things: a leftover value from a previous problem, a date entered in the wrong format, or confusion between the worksheet's local frequency setting and the calculator's global P/Y setting.

If none of these matches what you're seeing, clear the worksheet completely with [2ND] [CLR WORK] and re-enter every field from SDT onward, confirming each one before moving to the next.

1Why does my bond worksheet price not match my TVM key answer?

The two almost always disagree because of a mismatched day-count or frequency setting, not a calculation error. Check that frequency reads 2/Y for a semiannual bond and that settlement falls on a coupon date before comparing directly: off-coupon-date settlements will never match a plain TVM answer, since TVM has no concept of a partial period.

A second common cause is RV left at a value other than 100 from a prior problem, which scales the redemption component without warning.

A third, subtler cause: entering a stated annual coupon into CPN while pre-halving it for frequency. CPN always takes the full annual rate: the worksheet halves it internally, so don't do it yourself.

2How do I clear old values from the BOND worksheet?

Press [2ND] [BOND] to open the worksheet, then [2ND] [CLR WORK] to reset every field. Do this before starting any new bond problem, even if you're fairly sure the fields already hold what you need.

Note that [2ND] [CLR WORK] only clears the worksheet you're in; it doesn't touch P/Y or TVM values stored elsewhere, so you may still need [2ND] [CLR TVM] if you're switching between the two.

Clearing takes under two seconds and removes the single biggest source of wrong answers on this worksheet. Treat it as a non-negotiable first step every time. And remember it's a bullet-bond tool only: for amortizing loans or bonds with a shrinking principal balance, the standard bond worksheet doesn't apply. That's a job for the BA II Plus amortization worksheet instead.

Getting comfortable with every field on this worksheet, and knowing when to skip it for plain TVM keys, is a calculator-fluency skill the exam rewards directly through time saved on test day. Mastery here is half knowing how to run the worksheet and half knowing when to leave it closed. For the full set of keystroke sequences across every BA II Plus worksheet (TVM, cash flow, bond, and amortization), the CFA Calculator Tips e-book collects them in one printable reference.