Which mistake made this number?
Ten wrong answers, each one made by one of the ten mistakes in this guide.
A 10-year bond pays a 5% annual coupon on a par of 1,000 and yields 6%. The answer is −926.40. A candidate keyed 10 N, 6 I/Y, 50 PMT, 1000 FV, CPT PV and got −948.48.
Show the answer
B. In BGN mode every coupon arrives a period early, so the coupons' value is 1.06 times too big: 368.00 becomes 390.08, and 390.08 + 558.39 = 948.48. Close to the right answer, which is what makes it a trap. Switch back with 2ND [BGN], 2ND [SET], 2ND [QUIT].
1 / 10Next
Project: −5,000 today, then 1,000 a year for 4 years, then 1,500 a year for 2 years, at 8%. NPV should be 278.26. A candidate got −1,597.32.
Show the answer
B. F01 stayed at its default of 1, so the calculator saw one year of 1,000 and moved both 1,500s up to years 2 and 3. Three years of 1,000 vanished. Key 4 ENTER in F01 and 2 ENTER in F02.
2 / 10Next
You key 100 + 5 × 2 = expecting 110. The display shows 210.
Show the answer
B. In Chn mode the calculator works strictly left to right: (100 + 5) × 2 = 210. AOS gives 110. Check the setting under 2ND [FORMAT], or bracket the product: 100 + ( 5 × 2 ) = gives 110 in both modes.
3 / 10Next
PV of 1,000 received in 5 years at 8%: the answer is −680.58. Straight after a bond problem, a candidate keyed 5 N, 8 I/Y, 1000 FV, CPT PV and got −880.22.
Show the answer
A. The last bond's PMT of 50 was still stored, so the calculator added five payments of 50: 199.64 more. Press 2ND [CLR TVM] first, or key 0 PMT.
4 / 10Next
A zero-coupon bond pays 1,000 in 10 years; the yield is 6% with semiannual compounding. The answer is −553.68. A candidate got −744.09.
Show the answer
A. The rate was halved to 3% but N stayed at 10, so only five years were discounted. Ten years of semiannual periods is N = 20: 20 N, 3 I/Y, 1000 FV, CPT PV gives −553.68.
5 / 10Next
Same 10-year bond: 5% annual coupon, par 1,000, yield 6%, answer −926.40. On a calculator fresh out of the box, a candidate keyed the same five values and got −1,437.87.
Show the answer
C. With P/Y = 12 the calculator reads 6% as 0.5% a month and N = 10 as ten months, so it prices ten monthly coupons of 50 and barely discounts the 1,000. Set 2ND [P/Y], 1, ENTER, 2ND [QUIT].
6 / 10Next
You pay 900 today and receive 1,000 in 3 years. A candidate keyed 3 N, 900 PV, 1000 FV, CPT I/Y and the display showed Error 5.
Show the answer
B. Paying 900 and receiving 1,000 are opposite directions, so they need opposite signs. With both positive there is no rate that solves the equation. Key 900 +/- PV and CPT I/Y gives 3.57.
7 / 10Next
Project: −1,000 today, then 600 a year for 2 years, at 10%. NPV should be 41.32. The previous problem had three yearly flows, the last one 400. A candidate got 341.85.
Show the answer
B. The new flows overwrote CF0, C01 and C02, but the old C03 of 400 stayed, adding 300.53 of value at 10%. Press CF, then 2ND [CLR Work], before keying a new list.
8 / 10Next
With the display at 2 decimals, a candidate turns 6% compounded monthly into a growth factor and reads 1.06. They key 1.06 yˣ 10 × 10,000 = and get 17,908.48. The answer is 18,193.97.
Show the answer
C. The stored factor was 1.0616778; two decimals showed 1.06 and that is what got keyed. Over ten years the lost 0.17% a year costs 285. Set more decimals with 2ND [FORMAT], or keep the value in the calculator.
9 / 10Next
The display is at 4 decimals. Step 1 gives a monthly rate of 0.4868% for a 300,000, 30-year loan. A candidate writes 0.49, keys it as I/Y and gets a payment of 1,775.57. The answer is 1,768.11.
Show the answer
B. Rounding 0.4868 to 0.49 adds 7.46 to every payment: enough to land on a neighboring choice. STO the rate after step 1 and RCL it into I/Y instead of re-typing it.
10 / 10