BA II Plus Date Worksheet: Days Between Dates for the CFA

Press 2ND [DATE], key DT1 and DT2 as MM.DDYY (3.1527 is March 15, 2027) with ENTER, then go to DBD and press CPT: June 1 to December 1, 2026 is 183 days on ACT, 180 on 360. For T-bills and other actual/360 quotes, count on ACT and divide by 360 yourself.

  • Fixed Income
  • 11 min read
  • Updated

Day-count comparator

The same date pairs under three conventions, and the BA II Plus setting that counts each one.

CriterionACT/ACTACT/36030/360
BA II Plus settingACTACT, then ÷ 360 by hand360
Jun 1 → Dec 1, 2026183 days183 ÷ 360180 ÷ 360
Nov 15, 2026 → Feb 15, 202792 days92 ÷ 36090 ÷ 360
Feb 1 → Mar 1, 202728 days28 ÷ 36030 ÷ 360
Feb 1 → Mar 1, 2028 (leap year)29 days29 ÷ 36030 ÷ 360
Mar 15 → Sep 15, 2027184 days184 ÷ 360180 ÷ 360
Mar 1, 2027 → Mar 1, 2028366 days366 ÷ 360360 ÷ 360
Typical useU.S. Treasury notes and bondsU.S. T-bills, commercial paper, CDsU.S. corporate bonds, Eurobonds

The 360 setting counts 30-day months, so it is right for 30/360 only. Actual/360 counts real days: use ACT.

The BA II Plus date worksheet counts the exact number of days between two calendar dates in about twenty keystrokes. That sounds trivial, until you're staring at a T-bill discount yield problem with the clock running, counting days on your fingers because you forgot the calculator does it for you. Two dates in, one number out.

It's a short worksheet: only two input variables, DT1 and DT2. But it trips people up in two specific ways: the date entry format, and the ACT/360 setting that quietly changes your answer without changing anything on the screen. That second one is the trap: the count is wrong but the display looks fine. Get both right once and you stop bleeding points to date errors.

This is for CFA Level 1 and Level 2 candidates in fixed income and quantitative methods: anywhere accrued interest, discount yields, or holding period returns turn on an exact day count. We cover the keystrokes, the day-count settings, and where this worksheet shows up on the exam.

Entering dates: the MM.DDYY format

The BA II Plus date worksheet uses the format MM.DDYY: month, a decimal point, then day and a two-digit year, run together with no slashes. March 15, 2027 is entered as 3.1527, not 03/15/2027.

This format is unforgiving about digit count. The calculator expects exactly two digits after the decimal for the day and exactly two for the year. Type 3.527 intending "March 5, 2027" and the calculator reads day 52, year 70 (an invalid date) and either errors out or returns a wrong DBD.

Get comfortable with this format before relying on it in a timed setting. It's the single biggest source of wrong answers on this worksheet, and it has nothing to do with understanding day counts: it's purely a data-entry habit worth drilling once.

Accessing the worksheet

Press 2ND [DATE] (the DATE label sits above the number 1 key). This opens the date worksheet, showing DT1 as the first field.

Use the up/down arrow keys to scroll between DT1, DT2, and DBD (days between dates). Use ENTER to store a value into whichever field is showing, exactly like the bond and cash flow worksheets.

DT1 and DT2 live only in the date worksheet's own memory, separate from N, I/Y, PV, PMT, FV; entering dates here doesn't disturb any TVM calculation you have stored.

A worked entry example

Say you need a settlement date of June 1, 2026 and a maturity date of December 1, 2026. Six steps get a verified answer, laid out below.

The workflow is always the same: open the worksheet, key DT1, scroll, key DT2, scroll to DBD, then CPT. Learn this sequence once and every date problem becomes a five-second task.

StepKeystrokesDisplay
12ND [DATE]DT1 = (current stored value)
26.0126 ENTERDT1 = 6-01-2026
3↓DT2 = (current stored value)
412.0126 ENTERDT2 = 12-01-2026
5↓DBD = (computed after CPT)
6CPTDBD = 183.00

DT2 should be chronologically after DT1 in almost every exam problem: settlement before maturity, trade date before settlement date. The calculator will still compute a DBD if the dates are reversed, but an unexpectedly small or negative-looking result is your signal to check the order.

DBD: computing days between two dates

DBD stands for "days between dates," the output field of this worksheet. You don't enter it: you compute it with CPT once DT1 and DT2 are stored, and it returns the calendar day count between them.

There's no formula to memorize for the count itself; the calculation is automatic once the dates are correct. What you do need to track is which day-count basis the answer reflects, since DBD changes depending on whether ACT or 360 is selected (covered in the next section).

One quirk worth knowing: DBD treats DT1 as day zero. If DT1 is January 1 and DT2 is January 31, DBD returns 30, not 31. This matches how accrued-interest and discount-yield problems expect the count to work, since you're measuring elapsed time, not counting both endpoints.

Handling leap years

The date worksheet correctly accounts for leap years when ACT is active. Enter DT1 = 2.0128 (February 1, 2028) and DT2 = 3.0128 (March 1, 2028), and DBD returns 29, because 2028 is a leap year.

This matters whenever a problem spans a February in a leap year: 2028 and 2032 are the relevant ones for candidates sitting exams in upcoming windows. Compute DBD by hand instead and forget the extra day, and your yield calculation comes out off by a small but gradable margin.

The calculator handles this without any special input from you: you don't tell it a year is a leap year. Enter the dates accurately and trust DBD to do the rest.

DBD gives a raw day count, but most CFA problems ask for a yield or a price, not the count itself. DBD is an ingredient, not the dish. You plug the output into a separate discount yield, bond-equivalent yield, or accrued interest formula: for example, discount yield = (face value − price) / face value × (360 / days to maturity), where DBD supplies the denominator. Don't expect the date worksheet to output a final yield; it feeds a formula you apply separately, on paper or back in the TVM keys.

discount yield=face−priceface×360days to maturity\begin{aligned} \text{discount yield} &= \frac{\text{face} - \text{price}}{\text{face}} \\ &\times \frac{360}{\text{days to maturity}} \end{aligned}
DBD, counted on ACT, supplies the days to maturity.

ACT vs 360 day-count settings

The ACT/360 toggle changes how DBD is calculated, and it lives in a different place than DT1/DT2: press 2ND [DATE], scroll to the bottom of the worksheet where "ACT" or "360" is displayed, and press 2ND [SET] to toggle between them.

ACT (actual) counts the real calendar days between the two dates, including leap-year adjustments, the setting used in the leap year example above. 360 assumes every month has 30 days and every year has 360 days, which changes DBD even for the same DT1/DT2 pair.

Using the June 1 to December 1, 2026 example from earlier: under ACT, DBD = 183; under 360, DBD = 180 (six months × 30 days each). Same two dates, two different answers, and the display won't tell you which the question wants. That three-day gap is enough to flip a multiple-choice answer.

Why this setting catches candidates off guard

The ACT/360 indicator is small and easy to miss, and most candidates never think to check it because they don't expect the date worksheet to have a mode at all. It isn't reset by 2ND [CLR TVM], which only clears the TVM worksheet, and it isn't reset by 2ND [RESET] unless you do a full memory reset.

Whatever the last person set (you on a prior problem, or the factory default of ACT) is what you'll get unless you check. Before trusting a DBD output, glance at the bottom line of the display.

The safe habit is checking ACT/360 every time you open the worksheet for a new problem, the same way you'd check P/Y before a TVM calculation. One extra button press eliminates an entire category of avoidable errors.

Matching the setting to the instrument

Different money market instruments quote yields on different day-count bases by market convention, and the calculator's ACT/360 toggle needs to match whatever basis the problem specifies. It won't infer this from context.

The table below maps common CFA-tested instruments to their typical convention and the corresponding worksheet setting. Use it as a quick reference, but always defer to the day-count basis stated explicitly in the problem.

Instrument typeCommon day-count basisSet worksheet to
U.S. T-bills, commercial paperActual/360ACT
U.S. corporate bonds (accrued interest)30/360360
U.S. Treasury notes/bondsActual/actualACT
Eurobonds, many international bonds30/360360
Money market deposits (varies by currency)Actual/360 or Actual/365ACT

The calculator only offers two choices, ACT (actual/actual, roughly) and 360 (a 30/360-style count), while real markets use several conventions, including actual/365. When a problem specifies actual/365, compute the day count with ACT and apply the /365 divisor yourself, since the BA II Plus has no dedicated 365 mode. The same goes for actual/360: count the days with ACT and divide by 360 yourself, because the 360 setting counts 30-day months, not actual days.

Where day counts appear: T-bills, accrued interest, money market

Day-count problems show up most in fixed income and quantitative methods material, wherever a yield needs annualizing or a bond's accrued interest needs splitting between buyer and seller. The date worksheet earns its keep in these recurring problem types.

T-bill discount yield and bond-equivalent yield conversions are the clearest example: both formulas carry "days to maturity" in the denominator, and getting that count right by hand under time pressure is exactly the slip the calculator eliminates.

Accrued interest on coupon bonds is the other major use case: figuring out how many days have passed since the last coupon date, out of the total days in the coupon period, to prorate interest between buyer and seller at settlement.

T-bill and money market yield problems

A typical problem gives a T-bill's face value, purchase price, and days to maturity, then asks for the discount yield or bond-equivalent yield. When days-to-maturity isn't given directly, the date worksheet computes it in seconds.

Set ACT/360 to ACT for T-bill discount yield, since U.S. T-bills quote on actual/360: actual days over a 360-day year. Enter the purchase date as DT1 and maturity as DT2, compute DBD, and plug the result into your yield formula.

Certificates of deposit, commercial paper, and banker's acceptances follow the same workflow, since they also typically use actual/360 in U.S. markets.

A 92-day T-bill, counted on ACT

A T-bill bought on November 15, 2026 at 98.90 per 100, maturing February 15, 2027: the days, then the discount yield.

BA II Plus

DT1= (last date)

2ND[DATE]

The date worksheet opens on DT1.

1 / 8Next

DT1= 12-31-1990

2ND[CLR WORK]

Old dates cleared. The ACT/360 setting stays as it was.

2 / 8Next

DT1= 11-15-2026

11.1526ENTER

Purchase date, MM.DDYY.

3 / 8Next

DT2= 2-15-2027

↓2.1527ENTER

Maturity date.

4 / 8Next

ACT

↓↓

If it reads 360, press 2ND [SET] once: actual/360 counts real days.

5 / 8Next

DBD= 92.00

↑CPT

92 actual days. On 360 it would read 90.

6 / 8Next

0.00

2ND[QUIT]

Back to the standard calculator.

7 / 8Next

4.30

1.1×360÷92=

100 − 98.90 = 1.10 per 100 of face, so the result is the yield in percent: 4.30%.

8 / 8

Accrued interest on coupon bonds

Accrued interest is what a bond buyer owes the seller at settlement for interest earned since the last coupon: accrued interest = coupon payment × (days since last coupon / days in coupon period).

AI=coupon×tT\text{AI} = \text{coupon} \times \frac{t}{T}
t: days since the last coupon; T: days in the coupon period. Two DBD runs give both.

Both the numerator and denominator are day counts the worksheet can produce: DT1 as last coupon date and DT2 as settlement for the numerator, then DT1 as last coupon date and DT2 as next coupon date for the denominator. Match ACT/360 to the bond's stated convention: 30/360 for most U.S. corporates, actual/actual for U.S. Treasuries.

Running both DBD calculations takes about thirty seconds, versus several minutes of manual counting where one miscounted month wrecks the accrued interest figure and, with it, the price paid for the bond.

Compare the three day counts for the same dates in the table at the top

Common date-entry mistakes

Most date-worksheet errors are mechanical, not conceptual: candidates understand what a day count is for, but the calculator punishes small formatting and setting slips. Below are the mistakes we see most often, in roughly the order they cost people points.

Every one of these is fixable with a five-second habit change, and none require re-learning a formula. Catch yourself making one once, and it tends to stick after that.

Work through the list below before your next practice session and check whether any describe you.

  • Wrong date format: entering 03.152027 instead of 3.1527, or forgetting the two-digit year. The calculator often errors, but sometimes silently accepts a malformed date and returns a wrong DBD.
  • Not checking ACT/360: trusting a DBD output without glancing at which mode is active, especially when switching between problem types mid-session.
  • Swapping DT1 and DT2: entering the later date first, which can produce a negative or nonsensical DBD.
  • Forgetting DT1/DT2 persist: starting a new problem without re-entering both dates, so a leftover date from a prior question corrupts the new calculation.
  • Confusing DBD with a final answer: treating the day count as the yield or price itself, rather than an input to a separate formula.

Here's a short pre-calculation checklist worth running every time you open this worksheet on the exam:

  1. Press 2ND [DATE] and confirm you're on DT1.
  2. Enter the earlier date in MM.DDYY format, press ENTER.
  3. Scroll to DT2, enter the later date, press ENTER.
  4. Scroll to the ACT/360 line and confirm it matches the problem's stated convention.
  5. Scroll to DBD and press CPT.
  6. Sanity-check the result against a rough estimate (roughly 6 months should be near 180 days).

That last step matters more than it sounds. A rough mental check catches format and setting errors before they propagate into your final yield calculation.

Questions people ask

Two questions come up again and again once candidates start drilling this worksheet: how to wipe it clean between problems, and whether it can be trusted around a leap-year February. Both trace back to one theme: settings that persist when you assume they've reset. Each answer leads with the direct response, then the context.

Neither is really a mechanics question. They're about what the worksheet quietly remembers from the last problem while you move on: the kind of thing that costs a point without flashing an error.

Anything not covered here is likely addressed in the broader BA II Plus keystroke reference posts linked throughout this article.

1How do I clear the date worksheet on the BA II Plus?

Press 2ND [CLR WORK] while the date worksheet is open. It sets DT1 and DT2 back to 12-31-1990 and DBD to 0, and leaves the ACT/360 setting as it was. 2ND [CLR TVM] only clears the TVM registers, not DT1/DT2/DBD.

For a true clean slate including the ACT/360 setting, use 2ND [RESET] followed by ENTER, which performs a full calculator reset. This clears every worksheet, so use it only when you're not mid-problem on something else.

In practice, most candidates just overwrite DT1 and DT2 for each new problem rather than resetting, since re-entry is faster and doesn't disturb any other worksheet's stored values.

2Does the BA II Plus date worksheet account for leap years?

Yes, but only when the ACT setting is selected. Under ACT, the worksheet correctly adds the extra day for any February 29 within the date range, giving a true calendar day count.

Under the 360 setting, leap years are irrelevant because the worksheet assumes every month has exactly 30 days regardless of the actual calendar: a February spanning a leap year is treated identically to any other month.

This is one more reason to confirm the ACT/360 setting before trusting a DBD result: the same date pair spanning a leap-year February gives two different, both "correct," answers depending on which convention the problem calls for.

For the broader keystroke habits this worksheet shares with other BA II Plus functions (clearing registers, checking settings before you compute), our CFA Calculator Tips e-book walks through the full set of worksheets exam-day ready, worksheet by worksheet.

Related BA II Plus worksheets worth knowing alongside this one include the breakeven worksheet for cost-volume-profit problems, the depreciation worksheet for SL, DB, and SYD schedules, and continuous compounding for e^x-based growth problems. If your money market problem also involves an unconventional return metric, see our post on MIRR on the BA II Plus, and for quick percentage moves between two values, the percent change worksheet covers the Δ% key. Amortization-style cash flow problems are covered separately in our loan payment guide.